The Short Answer

Define which costs and activities the calculation includes, then distinguish customer orders from shipments, packages and units. Gather receiving, storage, handling, packaging, transport, relevant returns work and internal coordination without counting included costs twice.

Keep a period operating view alongside an estimate of the costs that change with another order or promotion. Segment by the work created, because an overall average can hide bulky items, bundles and split shipments. Compare in-house and outsourced arrangements on the same boundary, with transition expenses visible separately. Use actual records to explain changes and judge cost reductions alongside accuracy, damage, support and the customer promise. Price complex baskets from actual physical actions,including loose units,kitting,giftwrap,inserts and exceptions. Count earlier kit preparation once and reconcile per-order versus per-shipment or task charges against the trial invoice.

Key takeaways

  • Write the cost boundary and denominator above the calculation.
  • Translate complex orders into physical tasks and billed units before comparing pick-and-pack rates.
  • Separate the average operating cost from the cost of additional activity.
  • Investigate order mix and root causes before trying to reduce a line item.

“Our warehouse charges $3 per order” sounds like a useful answer until you discover that it excludes storage, packaging, postage and the work needed to receive the stock. Another team reports a $12 cost that includes all of those things. The numbers cannot help you choose between the arrangements until their boundaries match.

I would build two views. First, calculate what it costs to run fulfillment over a period. Then look at the costs that change when you accept different kinds of orders. The first helps you understand the operation; the second helps you make product, pricing and service decisions.

This is a management calculation, using deliberately simplified examples. It is not a prescription for statutory accounting or tax treatment, and the figures below are not industry benchmarks.

Define the question before calculating an average

There are several reasonable meanings of fulfillment cost. One team means warehouse handling before dispatch. Another includes transport to the customer. Another adds returns and the staff who resolve exceptions.

Choose a boundary for the decision you are making and write it above the calculation. For example: “Costs of receiving, storing, preparing and dispatching customer orders, including outbound transport and related returns handling, for April.” Keep product purchase cost and marketing spend separate if they are outside that boundary.

Then define the denominator. Are you dividing by customer orders, shipments, packages or units? One customer order can create two shipments and several packages. A replacement may produce additional warehouse and transport work without creating a new sale.

None of these measures is automatically wrong. The error is switching between them while keeping the label “per order.” Preserve the counts separately so a change in split shipments does not disappear inside an average.

Gather costs from the process, not one invoice

Walk a product through receiving, storage, order preparation, dispatch and the cases that come back. Record which party does each step and where its cost appears. This works whether the warehouse is your own or a partner's.

Typical places to look include receiving and checking stock, storage, picking, packing materials, additional preparation, outbound transport, returns inspection and systems directly used in the work. Include relevant internal labor even when a fulfillment company performs the physical handling.

DHL's fulfillment cost guide discusses categories including warehousing, packaging, labor, shipping and returns. It is a provider explanation of cost areas, not a price schedule for your business. Use your own invoices, agreements and recorded work to populate the calculation.

Watch for costs already included elsewhere. If a partner's fee includes a standard carton, adding an estimated carton cost again would double count it. If staff time is already in a departmental cost total, decide how it enters this view once rather than adding the same hours twice.

Build a monthly operating picture

Here is a hypothetical example for a brand with 1,000 customer orders and 1,080 outbound shipments in a month. All amounts are invented. The purpose is to make the calculation inspectable.

Cost within the chosen boundary Monthly amount What the team would verify
Receiving and stock preparation $600 Work performed and whether any amount belongs to a one-time transition
Storage $1,200 Storage basis and products occupying the space
Picking and packing labor or fees $2,500 Included steps and order configurations
Packaging materials $800 Materials not already included in handling fees
Outbound transport $6,480 Actual 1,080 shipments, including split or replacement movements
Returns processing $320 Returns handled during the period
Direct systems and internal coordination $600 Included software and recorded staff work
Total $12,500 Same boundary used for every comparison

The period's total divided by 1,000 customer orders is $12.50 per order. Dividing by 1,080 outbound shipments gives about $11.57 per shipment. The warehouse handling line alone is $2.50 per order. Those three numbers describe the same operation, but answer different questions.

Be especially careful with returns. Returns processed this month may belong to orders placed earlier. The example is a period operating view, not a claim about the lifetime cost of this month's orders. To study an order group's eventual cost, follow that group long enough to capture its later returns and exceptions.

Distinguish the next order from the whole operation

An average includes costs that do not necessarily change when one more order arrives. It can also miss a cost step that appears when the operation crosses a capacity or minimum-commitment boundary.

Suppose your warehouse has room and staff capacity for one more ordinary order. The immediate added work may be picking, packaging and transport. That does not mean storage and systems are free; it means the next order does not necessarily add another full share of every monthly bill.

Now suppose a promotion needs temporary labor, extra collection capacity or another storage area. Applying the quiet-month marginal cost to all promotional orders would understate the change. Ask what actually changes at the proposed workload.

For a pricing or promotion decision, estimate the added costs and any new commitments. For the ongoing health of the business, retain the full operating picture. Using only one view can lead either to rejecting useful orders or accepting growth that cannot support the operation.

Segment by the work an order creates

The most useful groups are usually those that explain cost differences: a single small item, a multi-item basket, a bulky product, a customized kit or an order requiring a particular service. Customer destination and split-shipment behavior can also matter.

Use actual handling and shipping records where possible. For shared costs such as storage, choose an allocation that reflects the question and label it as an estimate. A product that occupies substantial space for a long time should not disappear inside an allocation based only on its low monthly sales count.

In a second fictional example, a standard single-item order incurs $2.20 handling, $0.60 packaging and $5.80 outbound transport: $8.60 in these variable categories. A common two-item basket incurs $3.00 handling, $0.90 packaging and $6.40 transport: $10.30. The second item adds $1.70 to these costs, not another full $8.60.

That observation could matter when considering a bundle. But it does not establish that every bundle is profitable. Include the extra product cost, discount, payment cost and any other costs relevant to that separate commercial decision. Confirm that the assumed packing configuration really works.

Compare per-order and per-item handling quotes with the same baskets

A provider can charge a base amount per order, an amount per unit, a first-item fee plus additional-item fees, or another defined combination. Read the actual quote to establish what counts as an item and which preparation is included. A preassembled kit and several loose components may create different work even when the customer sees one offer.

For a deliberately fictional comparison, Quote A charges $3 per order including up to two items, then $0.60 for each additional item. Quote B charges $1.80 for the first item and $0.90 for each additional item. Assume for this example that the included handling is otherwise identical; storage, packaging, shipping and other charges are excluded from both.

Illustrative basket Quote A handling Quote B handling
One item $3.00 $1.80
Two items $3.00 $2.70
Five items $4.80 $5.40

Neither label identifies the cheapest option for every basket. With an invented mix of 60% one-item, 30% two-item and 10% five-item orders, the weighted handling averages are $3.18 for A and $2.43 for B. Change the basket mix and the comparison can change. These are invented prices for arithmetic, not provider rates or a recommended contract.

Apply actual order records to each quote, including the cases that create additional work. Check minimum commitments, multi-package rules, inserts, fragile handling, replacements and returns under the proposed agreement. Then add the other costs inside your chosen fulfillment boundary before selecting a provider.

Confirm how the quote becomes an invoice. A low first-item price is not useful if the team misunderstood whether a multi-piece product is charged as one unit or several. Reconcile a representative bill with the agreed definitions before relying on the forecast for a larger volume commitment.

For complex orders, describe the physical sequence before applying the rate. One order line can represent a preassembled kit, several loose components or a personalized item needing extra work. The website's line count does not necessarily tell you how many warehouse actions are required. Ask the provider to show which charge applies to each step and which steps are already included.

Consider a separate fictional handling example. A quote charges $2.40 per order including the first picked unit, then $0.50 for each additional loose unit. It also charges $0.80 for an optional gift-wrap task and $0.20 for a special insert. Assume all of these definitions have been agreed and packaging materials and transport remain outside this example.

Order prepared under those assumptions Handling calculation Handling total
One ordinary item $2.40 $2.40
Three loose items $2.40 + two additional picks at $0.50 $3.40
Three loose items with gift wrap and the special insert $3.40 + $0.80 + $0.20 $4.40

A preassembled three-piece kit might instead be picked as one stocked unit under a particular agreement. That does not make its assembly free: identify the earlier kitting work, its setup or batch charge and any unused prepared stock. Compare the full preparation cost once, rather than both ignoring assembly and counting the same work again at dispatch.

Keep exceptions identifiable in the order sample. Split packages, rework after a change, special inspection and replacements may produce additional activity under the actual contract. Ask for a worked invoice covering those cases instead of applying a standard single-item rate to all of them. Distinguish a charge per order from a charge per shipment, package, picked unit or preparation task.

Then apply the resulting categories to the actual mix and reconcile the trial bill. If the forecast differs, identify whether the cause was more complex orders, a misunderstood billing rule or work performed incorrectly. Each calls for a different response. Do not negotiate a lower headline rate before establishing which activity is driving the cost.

Compare pallet and cubic storage using the same stock pattern

Storage quotes need the same discipline. Ask what a billed pallet position or cubic unit actually represents under the proposal. Is the space measured from packed goods, an assigned location or reserved capacity? How are partly used positions, multiple products, minimums and changes during the month treated?

Consider an invented comparison for the same stock and period. Proposal A bills 20 pallet positions at $25 each, totaling $500. Proposal B bills 1,600 cubic feet at $0.25 each, totaling $400. These are fictional quantities and prices, not warehouse rates. The second total is lower only under the stated measurement assumptions and otherwise comparable included work.

If B's actual billed-space definition produces 2,400 cubic feet, its example total becomes $600. If A rounds partly occupied positions up or requires separate product locations, its billed count may differ from the team's rough estimate. That is why product dimensions or a theoretical packing calculation alone cannot validate the forecast.

Ask each provider to apply its method to the same inbound, storage and dispatch pattern, showing the measurement points and invoice calculation. Check whether charges use a peak, average, fixed commitment or another agreed basis. Review how slow-moving inventory, aged-stock charges, seasonal peaks and handling to consolidate space affect the proposal where applicable.

Keep the storage comparison beside the rest of fulfillment. A less expensive space measure can coexist with more handling or a larger minimum commitment. Choose the arrangement that fits the actual stock and work, rather than treating pallet versus cubic pricing as a universal winner.

Bins and shelves introduce the same question at a smaller scale: what quantity of billable space does this stock actually create? Twenty small products with separate identifiers may need a different location arrangement from the same physical volume of one product. Ask how picking space, reserve stock, returned goods and stock awaiting a decision enter the bill.

As one provider-specific example, ShipBob's storage explanation describes bin, shelf and pallet locations with a separate location for each SKU, plus a cubic-foot option for certain high-SKU businesses. Those are described offerings, not permission to assume every proposal uses the same allocation or rate. Obtain the method applicable to the actual account and stock.

Storage basis in a proposal What to resolve before multiplying by a rate
Bin Required location count, permitted product separation and capacity definition
Shelf Whether a whole or divided shelf is billed and how partly used space is treated
Pallet position Allowed configuration, separate picking locations and treatment after part of the pallet sells
Cubic space Whether the measured volume describes units, cartons, occupied locations or another agreed basis

Time matters as much as location size. In an invented 30-day-month example, 10 locations occupied for 15 days at an assumed $30 monthly rate cost $150 under exact daily proration. They cost $300 under a full-month charge for any occupied location, if that is the agreed rule. Neither figure is an industry standard; the example shows why a quoted monthly rate needs a billing definition.

Request a worked invoice using the same stock movements: starting balance, receipt dates, dispatches and closing balance. Check whether an emptied location stops billing automatically, whether consolidation requires extra work, and whether age is measured from receipt, lot or another event. Retain the actual location and inventory records so finance can trace a charge without guessing from month-end quantities alone.

Then decide what action changes the bill. Moving slow stock to cheaper space may add transfer and replenishment costs. Combining stock may be inappropriate when products or lots need separation. Ordering less can reduce occupied time but raise purchasing or stockout exposure. Evaluate those complete choices; a storage fee is often the visible result of an earlier assortment or purchasing decision.

Find the cause before trying to reduce a line item

If transport cost per order rises, look at shipment count and destination mix before blaming a rate increase. If handling rises, check whether orders contain more units or special preparation. If storage rises, look at stock quantities and dwell time, not just this month's sales.

The distinction changes the remedy. Split shipments caused by stock being spread across locations need a different response from unnecessarily large cartons. Repeated replacements caused by wrong picks need a different response from a more expensive but necessary delivery service.

Choose a change whose effect you can inspect. For a packaging change, check protection, dimensions, packing work and actual delivery outcomes. For a new picking process, check accuracy and staff effort. For a revised delivery offer, check whether customers still receive the service they reasonably understood they bought.

Do not call a cost reduction successful while the cost simply moves into support, returns or customer inconvenience. Keep those outcomes beside the line you are trying to improve.

Compare in-house and outsourced work fairly

Use the same order profile and service boundary for both options. For an internal operation, include labor, premises or relevant allocated space, equipment, systems and management. For a partner, include the complete quote and the work you still retain.

Keep assumptions visible. A provider proposal based on smooth daily volume may not represent a promotion-heavy business. An internal estimate based on unpaid founder packing time may not represent the cost of a sustainable operation.

Show transition expenses separately: preparing inventory, transferring stock, changing systems, training and running overlapping arrangements while orders continue. Do not treat those as normal monthly costs forever, but do not omit them from the decision to move.

Compare a plausible quiet period as well as normal and busy conditions. A contract minimum or fixed staffing commitment can affect each case differently. The decision should remain understandable when the growth forecast is not achieved.

Turn the calculation into a practical monthly review

Keep the cost boundary, source records and allocation method with the report. Reconcile major differences to invoices and operating counts. Record estimates plainly, and improve the parts that materially affect decisions before pursuing insignificant precision.

At each review, explain the biggest movement in ordinary language. “More orders needed two shipments because the accessory was stored separately” is useful. “Fulfillment efficiency declined” is not enough to decide what to do.

Choose one or two actions with a responsible person, such as fixing the stock location for a common bundle or correcting dimensions used in booking. Check later orders and bills to see whether the expected change occurred. A stable calculation that leads to a specific action is worth more than an elaborate dashboard no one can explain.

Questions about fulfillment cost

Should shipping be included in cost per order?

It can be, provided the boundary is explicit and consistent. Keep a view that includes outbound transport when judging the complete customer delivery cost. You can also show warehouse-only cost, but give it a different label and do not compare it directly with an all-in figure.

Why did cost per order rise when sales fell?

Some costs may have stayed while the number of orders fell. The order mix, storage, contract minimums and returns from earlier sales may also contribute. Reconcile the actual categories before concluding that warehouse performance worsened.

Can I use one average for every product?

An overall average helps describe the operation, but it can hide meaningful differences in size, storage, handling and shipment count. Use groups based on the work created when deciding product pricing, bundles, delivery offers or stock placement.

Continue with the DTCUP warehousing guides for related operating decisions. When reporting results, the website measurement guide offers a connected approach to keeping definitions and comparisons understandable.

If missing or duplicated order information makes the calculation unreliable, check the connected customer and operating journey using the website reliability guide. Repair the source process before treating its incomplete counts as a warehouse-cost problem.

Sources

  1. www.dhl.com — creative-strategies-to-minimize-e-commerce-fulfillment-costs
  2. www.shipbob.com — shipbob-storage-costs

Still have a question?Ask the DTCUP Community ↗

FAQ

Questions related to this insight.

Clear scope, practical constraints and direct answers for the decision ahead.

Should shipping be included in cost per order?

It can be, provided the boundary is explicit and consistent. Keep a view that includes outbound transport when judging the complete customer delivery cost. You can also show warehouse-only cost, but give it a different label and do not compare it directly with an all-in figure.

Why did cost per order rise when sales fell?

Some costs may have stayed while the number of orders fell. The order mix, storage, contract minimums and returns from earlier sales may also contribute. Reconcile the actual categories before concluding that warehouse performance worsened.

Can I use one average for every product?

An overall average helps describe the operation, but it can hide meaningful differences in size, storage, handling and shipment count. Use groups based on the work created when deciding product pricing, bundles, delivery offers or stock placement.